Rehabilitation and extension of the ports of Vale de Cavaleiros and Furna / Cape Verde
Port Vale de Cavaleiros
Port Vale de Cavaleiros
DESCPRIPTION OF PROJECT
Under this project the ports of Vale de Cavaleiros (Fogo Island) and Furna (Brava Island) were rehabilitated and extended in line with the future demand. To this end, new berths for conventional and Ro/Ro vessels were built. In Vale de Cavaleiros the breakwater which was partly destroyed by several storms was rehabilitated, extended and provided with a protection composed of 12.5-tonne Coreloc® elements, a new type of armour units which are much lighter than conventional armour units. The existing infrastructure was improved by building new roads, parking and storage areas, waiting halls, fencing etc. The design work included extensive field investiga­tions, statistical wave analyses and model tests to find the optimum breakwater design.
PROJECT COMPONENTS AND
TECHNICAL DATA
  • breakwater in Vale de Cavaleiros protected with 12.5-ton Core-Loc units
  • design wave height: 7.4 m
  • pre-cast concrete block-work quay walls
  • dredging of harbour basin to achieve sufficient water depth
  • land reclamation measures
  • Ro/Ro ramps in both harbours
  • design vessel of 50 m length
  • infrastructural measures

BRIEF DESCRIPTION
Rehabilitation and extension of the ports of Vale de Cavaleiros (Fogo Island) and Furna (Brava Island).
CLIENT
Ministério das Infraestruturas e Habitação
FINANCING
KfW Entwicklungsbank
SCOPE OF SERVICES
  • Tachymetric and bathymetric surveys
  • Flow and wave measurements
  • Sediment transport study
  • Environmental impact study
  • Port operations study
  • Model tests for the design of the breakwater
  • Preliminary and final designs
  • Drawing up of tender documents
  • Assistance in contract award
  • Construction supervision and commissioning